Project labor quota table
Serial number | Departmental position | Number (people) |
1 | Finance Department | 6 |
2 | Personnel Department | 4 |
3 | Marketing Department | 10 |
4 | Business Unit | 8 |
5 | Management | 10 |
6 | Technology Department | 12 |
7 | Production Department | 300 |
8 | R&D Department | 39 |
9 | Logistics Department | 11 |
10 | Purchasing Department | 10 |
11 | Quality Assurance Department | 15 |
Total | 425 |
The mechanics of the enterprise should follow the whole installation process, especially the installation of components, and be familiar with the working principle of the equipment, the equipment composition and the main structure of the equipment, so as to facilitate the maintenance after production. Electrical operators are the main body of production, and their training is particularly important, and their training should be based on theory and practice. The relevant operating procedures should be kept in mind, and the equipment should be trained on site during cold and hot commissioning so that the equipment can operate in a stable environment; the main person in charge and management personnel of the enterprise should participate in the training and assessment of the competent department and obtain qualifications Only after the certificate can serve.
The engineering and technical personnel and production workers of this project, in order to be familiar with the equipment, understand the maintenance, smooth operation and good production management, need to carry out in-plant training or go to the same type of domestic enterprise for training before production to adapt to the modernization of the project. The management and operation of automated advanced equipment enable the project to achieve high quality, high efficiency and economic operation. The training time is generally no less than 3 months. After passing the assessment or examination, you will be certified.
all rights reserved:Xuzhou Hongyang New Material Technology Co., Ltd.
design production:Winsharing